In this lesson
- It starts with a question. Three friends make cassava chips for the school fair. Mere washes 10 bowls an hour. Tevita peels 4 bowls an hour. Ana fries 8 bowls an hour. How many bowls are finished each hour?
- The idea you will find. A system is only as fast as its slowest step. — The slowest step is called the bottleneck, like the narrow neck of a bottle that limits how fast water pours. Speeding up any other step changes nothing, because the work still waits at the bottleneck. Fix the bottleneck first. Then measure again, because a different step will now be the slowest one.
- How you learn it. By doing: a slider, putting things in order.
- Length. 6 short steps. Progress saves on this phone.
Part of Touch Lab · Systems
Move a lever. Watch the system. That is statistics and code in the hand.